+86 137 7627 8625

WhatsApp/Mobile

1@festamachine.com

Quickly reply within 5hours

Automatic 5 gallon bottled water filling machine(600bph)

Application: Mineral water and other bottled water etc.

Applied Containers: 5 gallon, 3 gallon PC or PET barrels.

Filling System: Mechanical valve or flow-meter valve.

Capacity: 600BPH

Details About Automatic 5 gallon bottled water filling machine(600bph)

Barrelled production line is specially for producing 3-gallon and 5-gallon barreled drinking water. Integrating with washing, filling and sealing, it is the ideal manufacturing equipment of mineral water, distilled water and purified water. Adopting excellent stainless steel, it is corrosion resistant and easy to clean. The main original electric parts are of SIEMENS and OMRON; the airflow system adopts imported AirTAC products. With the advantages of compact structure, small space occupation, high, stable and reliable efficiency and high automation, it is mechanical, electric and gas full-automatic barreled equipmen

Leave your questions, we will reply to you within 11hrs





    Our Professional Workers

    PET bottle filling machine manufacturers

    Machining Equipment

    machining capacity for water bottling machine

    Successful Bottling Line Projects

    the complete bottling line manufacturer

    We only work with Top supplier

    top parts for filling machine

    Packaging and Delivery

    filling machine packaging machine

    Transfer your idea to final product

    Festa Machine_Hot_Fill_Complete_Line_Solutions_Complete_Line_

    FAQ about Festa

    We are an Original Equipment Manufacturer, so that we can provide you high quality machines in reasonable price. If you have plan to visit China, please visit our factory to check it.

    Design and production time is around 45 to 60 days, the exactly time depend on what kind of machine you order. The shipping time is based on your destination port.

    We will arrange our experienced engineers to your factory for installation and commissioning, and train your staff how to operate the whole production line.

    According your project, we will send one or two engineers to your plant, it will take about 15 days to 35 days.

    We can design the machines according your requirements (material, power, filling type, bottle type, automation level). We will also give you professional suggestions according to our experience.

    We offer you high quality machines with 12 months warranty and supply life-long technical support.

    Get Quote Today!