+86 137 7627 8625

WhatsApp/Mobile

1@festamachine.com

Quickly reply within 5hours

10000BPH(500ml) carbonated soft drink filling machine (DXGF32-32-8)

  1. DxGF32-32-8 carbonated soft drink filling machine capacity is 10,000BPH
  2. Automatic rinsing filling capping monobloc
  3.  SS304 stainless steel
  4.  SIEMENS PLC or equivalent brand
  5. With cap sterilization system
  6. Automatic oil lubrication system
  7. Parts in contact with CSD are made of S/S 316

Details About 10000BPH(500ml) carbonated soft drink filling machine (DXGF32-32-8)

Product Introduction:

This CSD filling machine is mainly used for carbonated soft drinks filling , soda water drinks filling and sparkling water filling . It combines rinsing, filling and capping in  one automatic body suitable for PET or other plastic bottles. If you want to start producing CSD, it is a good choice for you to consider Festa as your supplier. Our automatic CSD filling machine is easy to operate and run stable, most of our customers are happy with our equipment and service.

 

CSD rinsing filling capping monoblock

Leave your questions, we will reply to you within 11hrs





    Our Professional Workers

    PET bottle filling machine manufacturers

    Machining Equipment

    machining capacity for water bottling machine

    Successful Bottling Line Projects

    the complete bottling line manufacturer

    We only work with Top supplier

    top parts for filling machine

    Packaging and Delivery

    filling machine packaging machine

    Transfer your idea to final product

    Festa Machine_Hot_Fill_Complete_Line_Solutions_Complete_Line_

    FAQ about Festa

    We are an Original Equipment Manufacturer, so that we can provide you high quality machines in reasonable price. If you have plan to visit China, please visit our factory to check it.

    Design and production time is around 45 to 60 days, the exactly time depend on what kind of machine you order. The shipping time is based on your destination port.

    We will arrange our experienced engineers to your factory for installation and commissioning, and train your staff how to operate the whole production line.

    According your project, we will send one or two engineers to your plant, it will take about 15 days to 35 days.

    We can design the machines according your requirements (material, power, filling type, bottle type, automation level). We will also give you professional suggestions according to our experience.

    We offer you high quality machines with 12 months warranty and supply life-long technical support.

    Get Quote Today!